This project consists of a 30,000 square foot pre-engineered metal building addition to an existing manufacturing facility. The building addition adds four new loading docks with dock levelers and seals, bringing the total for the facility to nine. The existing concrete loading docks were also reconfigured to allow for more efficient truck access. A detention pond with bioswales was added to control water run-off on the site.