This project included an equipment wash bay, including drive-in mud-pit, that was added to an existing building. In addition, the project required the replacement of 31,000 SF of heavy-duty concrete paving and grading work. The project consisted of concrete foundations and floor slabs, load bearing CMU walls with steel roof structure, overhead doors with operators, walk doors, painting, plumbing and electrical systems.